Hanson's Wallgrove Quarry

​Hazardous materials removal and demolition of Hanson Construction Materials.

Project Overview

​Delta Group was contracted to complete the hazardous materials removal and demolition of Hanson Construction Materials , Wallgrove Quarry in Eastern Creek, NSW.

The project included hazardous material removal, structural demolition of decommissioned quarry batching plant including engineered induced felling and 2000t of salvageable  metal removal.

The 25m high control room was demolished by induced structural felling. The execution team utilised a method of engineered pre-cuts with oxy cutting equipment  and wire cables attached to excavators  to complete the fell.

Other Information

  • Client:
  • Value: $0
  • Region: New South Wales
  • Location: Wallgrove Quarry
  • Industry Sector: Civil
  • Start Date:
  • End Date: