A new apartment development built after the demolition of the existing Hotel was demolished by Delta.

Delta was contracted to do the Demolition of the existing Hotel ,bulk excavation, lateral support – which include the perimeter piling anchors and perimeter shotcrete, detail excavation works

The bulk earthworks consisted of  over 30000 m3 of material which comprised of contaminated fill, asbestos, Hydrocarbon contamination, and extremely hard limestone rock. The Bulk Excavation scope of works included 110 no perimeter  piles, anchors , construction of Shotcrete walls, slab prep and all detail excavation.

Although there were many obstacles to overcome in getting this project complete Delta managed to overcome them and complete the works to the satisfaction of the builder.​