Jamieson Aparments

Project Overview

A new apartment development built after the demolition of the existing office block was demolished by Delta.

Delta was contracted to do the Demolition of the existing office block ,bulk excavation, lateral support – which include the perimeter piling anchors and perimeter shotcrete, detail excavation works

The bulk earthworks consisted of  over 20000 m3 of material in a small footprint making the site an extremely tight site to excavateThe Bulk Excavation scope of works included 72 no perimeter  piles, anchors , construction of Shotcrete walls, slab prep and all detail excavation.

The rock encountered in the works was suitably dealt with ,with Deltas large excavators and hammers.​