A complex scope of works involved the combination of demolition and civil construction works due to a joined existing basement:
In order to overcome the unique challenges posed by the joined basement structure, it was filled with rubble which was battered back from the wall. Our piling rig was then positioned against the wall to complete the necessary retention works. As in previous CBD projects, we were operating within an extremely confined site footprint and we called upon our experience in designing and constructing a loading platform using temporary piles that acted as columns for the slab and which would eventually become part of the future structure. Other key achievements included:
Our integrated works programme is ongoing.