Asset One contracted Delta Group to complete demolition works for an overpass spanning one of the busiest thoroughfares in CBD Melbourne – the World Trade Centre Pedestrian Link Bridge over Flinders Street.

 
The scope of works included:

  • Site preparation, including amenities, materials hoist, gantries and perimeter scaffold.
  • Demolition of existing steel/concrete framed pedestrian bridge, including entry structures down to street level.
  • Removal of concrete pedestals at ground level as well as concrete foundations (below ground level).
  • Mobile cranage and rigging, including heavy lifts of up to 25t.
  • Coordinating full closure of Flinders Street, including transport logistics and traffic management/supervision.
  • Weatherproofing, infill hoarding and civil landscaping – pavements and roads.
  • Emissions, noise and vibration controls.
  • Recycling of construction waste materials.
  • Removal of asbestos and hazardous waste.

 

Our work was carried out at night to ensure minimal disruption to road users, with a staged demolition programme and removal of materials completed without incident.