The scope of works included:
Situated on the banks of the Yarra River, this project involved an extensive remediation programme to capture and dispose of contaminated soil, as well as to manage geotechnical challenges posed by Coode Island silt. In total, we excavated more than 350,000 cubic metres of spoil across both project sites.
As a key member of the Multiplex led project team, our civil works programme was a critical element in achieving a 6 Green Star environmental rating – a world first – for the Melbourne Convention Centre. Other key achievements included: